Expansion Continues At Santa Elena Deposit

 

VANCOUVER, BC - SilverCrest Mines Inc. reported results of further delineation drilling at the Santa Elena Mine in Sonora, Mexico. Since mid 2012, 132 drill holes have been completed to further expand underground resources and reserves. This drill program continues to be extremely successful with the most recent holes identifying additional bonanza grades and providing further intercepts in the El Cholugo Zone. To date, resources at Santa Elena have been delineated along a strike length of over 1,200 metres and to a depth of 600 metres. The results of all holes will be part of the ongoing resource expansion and reclassification to be included in the Pre-Feasibility Study for the Santa Elena Expansion Project which is nearing completion.

J. Scott Drever, President stated; "This delineation drill program has been immensely successful. We have drilled the known portion of the deposit at 35 to 40 metre centres, the Main Mineralized Zone has been extended by approximately 300 metres beyond our current resource boundary and we have identified two new sub-parallel zones, El Cholugo and El Cholugo Dos. The results of the revised underground resource and reserve estimations is expected to demonstrate an extended mine life with a conventional mill facility well beyond the original 5.5 years estimated for the open pit heap leach operation."

In this reported series, core hole SE-13-126 intercepted further Bonanza grades (greater than 34 gpt Au or greater than 1,000 gpt Ag) with 0.60 metres grading 5.2 gpt Au and 1,840 gpt Ag. These high grades are included in a broader interval of 21.6 metres grading 1.46 gpt Au and 169.1 gpt Ag.

Assay values in this series of holes range from 0.1 gpt to 22.0 gpt gold and 34.8 gpt to 1,840.0 gpt silver. Mineralized intervals range from 0.6 metres to 22.7 metres. All mineralized drill intercepts are near true thicknesses.

The El Cholugo Zone continues to expand to the west and to depth with 6 new drill hole intercepts. The dimensions of this newly discovered zone is now approximately 400 metres long by 150 metres high with widths ranging from 1.7 to 17.1 metres.

Several Holes (Holes SE-13-121, 123, 128, and 141) extend the strong silver and gold mineralization along the Main Mineralized Zone to the east and to depth. These intercepts are up to 300 metres beyond the boundary of current resource estimates. Core holes SE-13-132, 135, 137, 139, 140 further expand mineralization 300 metres to the west under the current operating pit. Further drilling is underway to help delineate theses area of continued expansion.

Approximately 48,000 metres of drilling have been completed to date in the 2012-2103 program to convert underground resources to reserves and expand total resources. Three drills are currently on site completing the extended program. Summary results for revised Santa Elena Resources and Reserves are expected in late April or early May, 2013 with a NI 43-101 Technical Report for the Pre-Feasibility Study of the Expansion Plan to be filed within 45 days following announcement.